ghd hair straighteners
About Production Enterprises Investor Career Partners News Contacts

Rail carriage train

 

Rail carriage train of large capacity RS-800/3

Purpose:Rail carriage train of large capacity PC-800/3 (hereafter special train), is designed for loading rail welded joints from processing lines of rail welding enterprises, carriage of joints to place of laying jointless tracks, unloading at railway hauls, loading on train old usable rail joints from tracks and their subsequent carriage to place of repeat laying or repair.
The special train is formed from, 60 eight-wheel uniform platform of model 13-4012, one universal platform of model 13-401 and eight-wheel passenger wagon, reequipped as per design 2868.01.00.000 “Wagon for accompanying track machines (guard’s van)”.

Technical specifications

Gauge, mm
1,520; 1,435
Annual carriage volume, km track
252

Type of rails transported

R50, R65, R75

Maximum number of joints of any type rails, transported on the special train, pcs

30
Joint length (maximum), m
800
Special train equipment weight, ton
204
Weight of useful cargo (R65), ton
1,560
Speed of special train with rails (maximum), km/hr
80

Length of train along axes of outermost automatic coupling of direction platform 1 and platform 61 (end), m

nominal
892
Minimum
883

Equipment dimension

1-T GOST 9238-83

Communication on special train

Radio station

Maintenance staff, persons

4

Reliability factors:

Average life to capital repairs of special train, km of track, not less than

2,520
Life, years
30

Manufacturability criteria:

Specific material capacity (annual), ton/km of track, not more than

6
Factors of unification and standardisation level

Coefficient of repeatability, %

80

 

 

Photo

 
ghd hair http://trade.ecoaccord.org/