Intended for transportation of cement in bulk, with loading via the upper hatches and with discharge by gravity via the lower hatches into the inter-rail space on unloading bridges.
If installed onto platforms of the inventory rolling stock of Russian Railways OJSC, the equipment in question allows providing for maximum possible loading of 100 meters long rails on the carriage rolling stock. The removable equipment for transportation of 100 meters long rails is applied for arrangement of rails, loaded from the manufacturing lines of integrated iron-and-steel works, and transportation of the rails to warehouses of the rail-welding undertakings (RWU), reconstructed for acceptance of the rails having length of 100 m. The equipment is arranged onto four-axle platforms of model «ПМ-820» or general-purpose platforms of models 13-401 and 13-4012 with loading upon axle of 23.5 t.
Platform «ПМ-820» is intended for transportation of materials and equipment in the course of repair of railway tracks. The Platform is certified according to Technical Specifications 3182 003-52398439-04, Conformance Certificate No ССФЖТ RU. ЦВ02.Б.04912.
The Unified Removable Equipment (URE), installed onto platforms «ПМ-820», is intended for transportation of packages of rail sections having length of 12.5 m and 25 m.
The Maintenance Module represents a non self-propelled wagon for transportation of teams, working at the railroad construction facilities. The designers have designed three versions of the modules. The first wagon modification serves for transportation of the teams to the work performance place at the railroad. Onto the module frame an electric power station with power output of 16 kW is installed. The electric power unit secures uninterrupted operation of all the lighting and heating appliances and of air-conditioning system. The second modification of Module «Путник −10» («Wanderer-10») is equipped with an electric power station and a diesel-operated compressor; it is provided with a special pneumatic pipe-line, providing self-unloading wagons with compressed air. The third modification of the Module is intended for transportation of people and hauling of the process equipment, application of which in combination with the track rail-welding machine secures high-quality welding of rail strings. The Module holds 20 persons and is equipped with life support systems.
High-Capacity Train Set of Wagons for Transportation of Rails «РС-800/3» (hereinafter referred to as «The special train set of wagons») is intended for loading of welded rail strings from manufacturing lines of rail-welding undertakings, transportation of the strings to places of laying of continuous welded rail, unloading at station-to-station blocks, loading removed from the tracks used serviceable rail strings onto the train set of wagons and their further transportation to the place of repeated laying or repairing. The special train set of wagons is formed of 60 four-axle general-purpose platforms of model 13-4012, one general-purpose platform of model 13-401 and one four-axle passenger wagon, reequipped in accordance with Project 2868.01.00.000 «Wagon for accompanying track machines (guard’s van).»
Hopper-Batcher «ВПМ-770» is intended for transportation of all types of ballast, ballast mechanized unloading with simultaneous laying onto the track skeleton, with dozing and mixing, with a possibility to interrupt the ballast unloading process and to limit its filling into the track middle portion.
Celebrations dedicated to the 175th anniversary of the railway of Russia will take place since September 7 to September 9 in Shcherbinka microdistrict (Moscow) on the basis of the experimental rail ring of the All-Russian Scientific Research Institute of Railway Transport.
Traditional international exhibition of rail transport InnoTrans, which unites the largest manufacturers of railway technics, will take place in Berlin since September 18 to September 21, 2012.
Celebrations dedicated to the 175th anniversary of the railway of Russia will take place since September 7 to September 9 in Shcherbinka microdistrict (Moscow) on the basis of the experimental rail ring of the All-Russian Scientific Research Institute of Railway Transport.
PRM Group took part in the 15th African international conference and specialized exhibition of the rail industry in Johannesburg (South Africa) from 25 to 28 June this year.
From May 31 to June 1, 2012 in Sochi, the VII International Rail Business Forum «Strategic Partnership 1520» took place, a key theme of which was the growth formula of the «1520 space» in the system of economic and trade unions. The forum was attended by the Director General of RPM Evgeny Yakovlev, First Deputy Director General for Finance Maxim Naumchenko.